PROJECT DATA
- Client: Elecnor
- Date: 2020
- Technology: Hydraulic and CFD Analysis (Computational Fluid Dynamic)
INTRODUCTION
The Barka Res & PS Compound counts with several reservoirs connected to the existing PS by suction pipe network. The Complex is going to be enlarged with the installation of the New Barka Pumping Station, which will receive water from these reservoirs by a connection of a new pipe. Due to its expansion, the existing suction pipelines have to be upgraded by adding or removing some of current pipes. Therefore, the new hydraulic system as well as the two pump houses have to satisfy the steady state hydraulic requirements to ensure the suitable operation in the different load scenarios.
Barka Res & PS Compound» – Complete Hydraulic Circuit
ACTIVITIES
Following analysis and activities have been performed:
- Steady State Analysis
- NPSH and submergence analysis
- CFD Analysis:
- New Barka Pump Station – Manifold
- Main suction pipe network
- Reservoir Inlet
«New Barka Pump Station» – CFD Analysis – Velocity Streamlines